How to Price a Public Sector Tender Without Losing Money or the Bid

A calculator and pencil resting on a page of handwritten workings

Price questions look like the easy part of a tender. There is no essay to write: just a schedule to fill in. Yet more bids are lost — or won and then regretted — on price than on anything else.

The reason is that a public tender price is not just what you would charge. It is a number scored by a formula, against competitors you cannot see, for a contract you will be held to for years.

How price is usually scored

Under the Procurement Act 2023, contracts are awarded to the most advantageous tender, assessed against published award criteria. Price is almost always one of them, often weighted somewhere between 20% and 60%, depending on how standard the work is.

The commonest formula is relative: the lowest price gets full marks, and everyone else scores in proportion.

Your price score = (lowest price ÷ your price) × the price weighting

On a 40% price weighting, a bid 10% above the lowest scores around 36.4. A bid 25% above scores 32. Those gaps are recoverable on quality. A bid 60% above is not.

Some buyers use other methods — scoring against a budget, deducting marks per percentage above the lowest, or a fixed price where quality alone decides. Read the pricing methodology before you price, because it changes what a sensible number is.

Build up the price from the bottom

A credible tender price is built, not guessed.

Direct costs. Labour at the rates you will actually pay — including the real Living Wage if the buyer requires it, holiday, sickness cover, pension, National Insurance and training time. Materials, equipment, vehicles, fuel, subcontractors.

Contract-specific costs. Mobilisation, uniforms, IT and reporting systems the buyer requires, insurance to the levels stated, any accreditations you must obtain.

Overheads. A fair share of your management, office, finance and HR.

Risk. Volume uncertainty, inflation over a multi-year term, the TUPE liabilities of staff who may transfer to you, penalties under service credits.

Margin. What makes the contract worth having.

Then compare the total against everything you can learn about what the buyer pays today — the previous award notice, published spending data, their budget if stated.

Read the commercial terms as part of the price

The terms are part of the price, whether or not they are on the schedule.

  • Indexation. Is there an annual price review? Against which index? If not, you carry inflation risk for the whole term.
  • Volumes. Are they guaranteed, or estimates? A framework with "no guarantee of work" is a different price from a contract with fixed volumes.
  • Service credits and KPIs. What do you lose if you miss a target?
  • Payment terms. Public bodies must pay valid, undisputed invoices within 30 days under the Act. That is better than many private clients — but check when you are allowed to invoice.
  • Exit and TUPE. What happens to your staff and assets at the end.

Fill in their template, exactly

Pricing schedules are often spreadsheets with locked cells and specific assumptions. Common ways bids fail on paper:

  • Leaving a mandatory line blank, or entering zero where you meant "included elsewhere".
  • Adding qualifications or assumptions the buyer said it would not accept.
  • Totals that do not match the sum of the lines.
  • Pricing ex-VAT where they asked inc-VAT, or the reverse.
  • Changing the units — per hour vs per visit, annual vs whole-term.

If anything in the template is unclear, ask a clarification question before the deadline. Answers are usually shared with every bidder, which is fine; guessing is worse.

What if your price looks too low?

The Act lets a contracting authority disregard a tender whose price it considers abnormally low for performance of the contract — but it must first tell the supplier and give it a reasonable chance to explain. Current government guidance says a low price should not be rejected automatically.

If you are asked, have the build-up ready: labour rates, hours, efficiency you can evidence, why your overheads are genuinely lower. "We want the reference" is an honest reason but not a sufficient explanation. A buyer that cannot see how you will deliver at that price will worry about you failing mid-contract, and that is a reasonable worry.

The more important question is your own: can you deliver this for this price for the full term? Winning a five-year contract at a loss is worse than losing it.

A quick sense check before you submit

  • Does the price cover full employment costs at the wage levels the contract requires?
  • Have you priced for the volumes most likely, not the most hopeful?
  • Would you still want this contract in year three, after inflation?
  • Is every mandatory cell filled and every total right?

Know the market before you price it

The best-priced bids are for contracts the supplier should have been bidding for in the first place. TendersHub lets you filter 11,100+ live UK tenders by value and contract length, so you only price work that fits what you can deliver — and the bid pipeline keeps the value of each bid and each win in one place, so you can see what your prices are actually winning.