The quickest way to improve your win rate is not to write better bids. It is to stop writing the bids you were never going to win.
Every tender you chase costs something real: the hours of the people who write it, the work they did not do instead, and the morale of a team that loses five in a row. Suppliers who win public work consistently tend to bid for fewer tenders, not more — and to decide early.
Decide in the first hour, not the last week
The worst bid/no-bid decision is the one made by default: you start reading, you start drafting, and three days later you are committed without ever asking whether you should be.
Make the decision deliberately, within a day of finding the opportunity, against a short set of questions. Then stick to it.
The questions that matter
1. Can we actually do this work? Not "could we, with a stretch". Do you deliver this service, at this scale, in this area, now? If the honest answer needs a new subcontractor, new staff and a new accreditation, it is probably a no — or a partnership.
2. Do we meet the conditions of participation? Turnover, insurance levels, accreditations, relevant experience. These are often pass/fail. If you fail one, nothing else you write will be scored. Check them first.
3. Do we have evidence? Most quality questions reward relevant examples. If you cannot point to a contract where you did something similar, you will struggle against suppliers who can.
4. Is the size right? A contract worth many times your turnover is a risk for the buyer and for you. A contract so small it costs more to bid for than it makes is not worth it either.
5. Do we know anything the other bidders do not? About the buyer, the site, the service users, the local area, the problems with the current service. An edge you can write about is worth more than polish.
6. Who is the incumbent, and are they likely to keep it? If the current supplier has delivered well for years and the specification looks written around them, your chances are lower. If the buyer is re-tendering early or changing the specification significantly, they may be looking for something different.
7. Do we have time? Count the days to the deadline, subtract clarification questions and sign-off, and ask whether the people who need to write it are actually free.
8. Does the price work? Read the pricing methodology and commercial terms. If you cannot see a way to price competitively and still make money, stop now.
9. Do we want this contract? Would you be happy delivering it for its full term, with this buyer, on these terms?
The warning signs in a tender pack
Some things in the documents tell you to look harder before committing:
- A very short tender period for a complex requirement.
- Experience requirements so specific that only one supplier could meet them.
- Unlimited liability, punitive service credits or one-sided termination terms.
- A specification that is vague about volumes, but a pricing schedule that wants a fixed price.
- TUPE information that is missing or incomplete for a service contract.
- Award criteria heavily weighted to price for something where quality clearly matters.
None of these is automatically a no. They are prompts to ask clarification questions, and to price the risk if you go ahead.
Score it, simply
You do not need a complicated matrix. Give each question above a score of 0 to 2, and set your own threshold — many suppliers use something like any 0 on questions 1 or 2 is a no; below about 12 out of 18 needs a very good reason. The value is not the number; it is that the decision is written down and the same questions get asked every time.
Review your decisions every few months. If you keep losing tenders you scored highly, your scoring is too generous. If you keep winning the ones you nearly did not bid for, it is too strict.
When "no bid" becomes "not yet"
A no today can still be useful.
- Register interest anyway if you can, to receive clarifications and see how the buyer runs things.
- Note the contract end date. The same work will be re-tendered, and you can be ready next time.
- Talk to the likely winner about subcontracting, if part of the work fits you well.
- Look for the smaller lots. A large tender split into lots may have one you can win on its own.
Spend the time on the right tenders
Bid/no-bid starts with what you are shown. If your search turns up two hundred loosely relevant tenders a week, you will either drown or skim. TendersHub's AI matching ranks 11,100+ live UK tenders by how well they fit your company — your services, your area, the contract sizes you can handle — with the reasons for each match, so the first hour of a bid/no-bid decision starts from a shortlist instead of a haystack.